Geffers Ride footpath work Saturday 7th June

  • 0
  • June 03, 2014

Dear Residents

Please be advised that two sections of footpath will be replaced on Saturday the 7th June that were inadvertently contaminated with tack coat during the road works.

The areas are both approx. 10m long; Section 1 is from the shared driveway of houses 2/3/4 running into the development, Section 2 is the first 10m of the right hand footpath running into the development.

Inconvenience will be limited but please be aware that workman will be operating on the footpath and road so please reduce your speed to safeguard their safety and the safety of residents who will need to walk on the road for a short distance during the works.

Regards
David